Week 14

These pictures are of the formwork required for pouring the concrete exterior wallpanels. The panels shown are primarily for the school portion of the building. Once above freezing temperatures can be expected for a few consecutive days, these panels will be poured. The panels for the auditorium and ministry administration area will be next.
 
Once poured, it will take about a week for the concrete panels to cure and stengthen sufficiently to allow them to be raised to a vertical position. The panels will be temporarily secured in place and shortly thereafter, the erection of the structural steel framing will follow, which ultimately supports the wall panels and the roof framing system. 

We praise God for allowing this progress on our South Site!